Alectra Utilities has retained WSP Canada Inc. (WSP) to prepare a Class Environmental Assessment (EA) study for a proposed 230 kiloVolt (kV) Municipal Transformer Station (Vaughan MTS #6) in Vaughan with the capacity of 170 Mega Volt Ampere (MVA), which will connect to an existing 230 kV transmission line. The new Vaughan MTS #6 will transform the high voltage (230 kV) to distribution voltage (27.6 kV) and provide capacity to an Alectra customer’s new facility with a maximum demand of 108 MVA with a planned operation in 2027.

Purpose

An undisclosed customer has proposed a 108 MVA data center in the Langstaff Road/Hwy 27 area in Vaughan. Alectra does not have capacity in the current system to meet the forecasted customer demand beyond 2026. In order to meet the forecast capacity deficiency, additional transformation and feeder capacity needs to be operational by Q4 2026. 

The customer’s maximum demand is forecasted to be 108 MVA and will require ten (10) 27.6 kV feeders to meet 100% redundant supply needs. It is proposed that a Bermondsey type transformer station is required to meet the customer’s long-term needs. A typical Bermondsey type transformer station has two 125 MVA transformers, twelve 27.6 kV feeders, and 170 MVA capacity. Figure 1 below is an example of a typical transformer station.

typical transformer station
Figure1: Typical transformer station.
Figure 2: Existing Hydro One 230 kV line and towers located west of the Vaughan MTS #6 study area.

The proposed site is located at the northeast corner of Line Drive and Langstaff Road. The line connection will involve the installation of 230 kV cables in an underground duct bank to connect the station to the existing Hydro One 230 kV transmission line and towers located west of the study area (Figure 2 above). The proposed underground 230 kV cables, which will be approximately 425 metres (m) long, will convey electricity from the existing Hydro One tower located southwest of the study area to a new municipal transformer station in Vaughan, and then a 27.6 kV underground duct bank line will convey electricity to the future data facility.

The Process

The Study is subject to the Class EA for Minor Transmission Facilities (Class EA for MTF) in accordance with the Ontario Environmental Assessment Act. The Class EA for MTF is a streamlined process for planning transmission projects that have a predictable range of environmental effects and feasible mitigation measures that can be applied (www.hydroone.com/ClassEA). The Class EA process includes public and agency consultation, Indigenous community engagement, an assessment of the potential effects of the proposed project, and the identification of mitigation measures.

Within the Class EA for MTF there are two tiers of assessment corresponding to project scale and potential for environmental effects. These include:

  1. Screening Process, and
  2. Full Class EA Process.

The Screening Process is a streamlined process for smaller scale projects with minimal environmental effects (confirmed upon satisfying 16 screening criteria). Based on completing the consultation activities and fulfillment of the 16 screening criteria, this Study will follow the Screening Process.

In the months ahead, we will collect environmental and technical data to assess the study area. We will also gather input on the proposed project from residents, Indigenous communities, local businesses, government agencies, and interest groups. Once the Class EA process is successfully completed, construction could commence as early as May 2025, and be completed by the end of 2026.

Alectra Vaughan MTS #6 Class EA

Vaughan MTS #6 Class EA - Important Documents

View key documents related to the Alectra Vaughan MTS #6 Class EA project including maps, public notices, and display materials.

Your Feedback

Vaughan MTS #6 Class EA – Contact the Project Team

Get the answers you’re looking for from the experts working on the Vaughan MTS #6 Class EA.

If you have questions, please contact us so that a member of our team can help you.

Riaz Shaikh, P.Eng.
Manager, Distribution System Planning
Alectra Utilities Corporation
Tel: (905) 798-2930
Email: project_VTS6@alectrautilities.com

Nadia Dabagh
Consultation and Engagement Lead
WSP Canada Inc.
Tel: (289) 835-2519
Email: project_VTS6@alectrautilities.com

Comment Form

Alectra logo

Alectra Utilities Holiday Office Hours

Happy Holidays! Alectra Utilities offices will be closed in observance of the Christmas and New Year’s statutory holidays. 

Our holiday hours of operation are as follows: 

  • Tuesday, December 24, 2024: 8:30 a.m to 12:00 p.m. 
  • Wednesday, December 25, 2024: Closed 
  • Thursday, December 26, 2024: Closed 
  • Tuesday, December 31, 2024: 8:30 a.m to 12:00 p.m. 
  • Wednesday, January 1, 2025: Closed 

Regular office hours resume on Thursday, January 2, 2025. 

Start the New Year with My Alectra: Keep your bills up to date and go green by registering for My Alectra and paperless billing. Enjoy the convenience of managing your bills online, anytime, anywhere. Sign up now

Need Additional Support? We have all the online forms you need to request our services including opening or closing an account, reporting an outage, and general inquiries.

Is your location?